国产超碰人人做人人爱,亚洲av成人一区二区三区 ,欧美成人午夜视频,在线视频97

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
Industry news

Where are you now:Home >> News >> Industry news
Introduction to the specific steps of PCBA proofing process!
Time:2022-07-21 Read: 2681

With the development of the times, the electronic industry products are developing in a series of directions such as miniaturization, precision, thinning of the body, and fan heat dissipation. The requirements for PCB processing and assembly density are increasing. We all know that in the chip processing industry, when processing the chip, it is not only necessary to ensure the integrity of the chip, but also pay attention to the surface of the chip. Whether the solder joints are complete, because if the solder joints are incomplete, there will be a series of problems such as solder joint failure. The following will introduce the specific operation process of PCBA proofing:


  PCBA proofing operation process


  1. Customer orders


  The customer places an order with the PCBA processing factory according to the actual situation, and puts forward specific requirements. The PCBA processing factory will evaluate its own ability to see if it can complete the order. If the PCBA manufacturer determines that it can complete the order within a certain period of time, the two parties will negotiate to determine the details of each production.


  2. Production materials provided by customers


  After the customer decides to place an order, the PCBA processing factory will provide a series of documents and lists such as PCB electronic files, coordinate files, and BOM lists required for production.


  3. Raw material procurement


  The PCBA processing plant purchases the relevant raw materials from the designated suppliers according to the documents provided by the customer.

  4. Incoming material inspection


  Before PCBA proofing, all raw materials used, PCBA processing factory needs strict quality inspection. After being qualified, it can be put into production.


  5. PCBA production


  When doing PCBA proofing, in order to ensure the production quality, whether it is SMD production or welding production, PCBA processing manufacturers need to strictly control the furnace temperature.


  6. PCBA test


  PCBA processing plants also require strict testing, and only PCB boards that pass the test can be delivered to customers.


  7. Aftermarket packaging


  After the PCBA proofing is completed, the product needs to be packaged and then delivered to the customer to complete the entire proofing work.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: 024gangchang.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號(hào)
  • Links:
松桃| 乐清市| 垦利县| 武山县| 苗栗县| 大石桥市| 德保县| 涡阳县| 临澧县| 平江县| 景德镇市| 舞钢市| 白水县| 大兴区| 河西区| 新巴尔虎右旗| 岗巴县| 含山县| 陵水| 肃宁县| 驻马店市| 洪江市| 嘉鱼县| 西林县| 德钦县| 资中县| 化州市| 崇阳县| 新乐市| 伊宁县| 浦北县| 即墨市| 佛教| 邻水| 崇义县| 兰坪| 广东省| 德惠市| 新津县| 和顺县| 蓬溪县|